Riverfront Field Relocation

   Riverfront Field Relocation Feasibility Study

Concept design for the Riverfront Recreation Field Relocation project

Project Overview

The Department of Physical Education and Recreation (PE and Rec) commissioned a feasibility study to relocate and enhance the university’s riverfront recreation fields. The concept design addresses limitations of the existing recreation fields and aligns with the Campus Plan’s intent to move the recreation fields further from the river. The concept design and cost estimate developed through this study will inform the viability and timing of a future capital project.

The proposed relocation would create high-quality recreation fields to better support on-campus intramural and club sports. The study includes a range of turf materials and amenities related to the recreation fields. Moving the fields out of the Willamette River Natural Area allows for opportunities for ecological restoration and realigning the South Bank Path to relate more to the river. A small restroom and storage building would better support programming and student use of the fields.

Objectives

Enhance On-Campus Recreation: Provide modern, well-designed recreation fields to support intramural and club sports, improve safety, and enhance the student experience.

Support Restoration of the Willamette River Natural Area (WRNA): Moving existing recreation fields out of the WRNA allows for implementing restoration outlined in the WRNA Landscape Management Plan.

Improve Connectivity and Access: Realign the South Bank Path to integrate with the new field layout, enhancing pedestrian and cyclist experience along the riverfront.

Willamette river with the sun setting

Project Stats

Project Status: Concept Design

Anticipated Budget: $15M - $21M

Location: Willamette River Natural Area, 
west of Frohnmayer footbridge

   Image Gallery

Click to enlarge images

   Additional Information and Links

Riverfront Field Relocation Project 
Recreation Field Location Option Study 
Campus Planning Committee (CPC) meetings
  • May 31, 2019: record available upon request
  • April 16, 2019: record available upon request

Check back later for more information as this project progresses!


For additional information, please contact:

Aaron Olsen
Assistant Director - Campus Planning
aaolsen@uoregon.edu 
541-346-5564