Completed - Feasibility/Conceptual/Siting Studies

This study is authored by the Campus Planning Office. It explores options for additions and renovations to the existing University Health, Counseling and Testing Center and suggests a feasible project to meet the needs of the units located within the building. March 2016.
 
Chapman Hall Programming Study
The purpose of this Programming Study is to record how Chapman Hall is currently being used, to identify the ways in which it could be reconfigured to support the mission of the Clark Honors College, and to establish a series of Planning Principals to guide future design work. August 2015.

Many Nations Long House Conceptual Plans
This conceptual study analyzes the Many Nations Longhouse expansion and opportunities for the buildout of the Expression Place and Many Nations Longhouse Axis. December 2010

Museum of Natural and Cultural History Conceptual Design Report
This study re-examined the previous phase 3 conceptual study for the museum's Research Division expansion and its related support spaces, and the completion of surface site access. December 2011

Residence Hall Feasibility and Market Demand Study
This study analyzes the market demand for on-campus student housing and the financial feasibility of the university’s housing goals. September 2011

Residence Hall Modernization Study
RHMS Annotated Map
This conceptual study provides the UO with possible development options for the next residence hall and scenarios for future build-out of the residence hall system. August 2011.

Strategic Housing Plan
Strategic Housing Plan Attachements

This report includes housing objectives, a comprehensive housing analysis (existing conditions and market study) and a proposed implementation plan.

University Street Feasibility Study
This feasibility study examines extending the academic campus between 15th and 18th Avenues along University Street to include the Student Recreation Center, PE/Rec Department, the Department of Human Physiology, general classrooms, and the School of Architecture & Allied Arts. March 2012

Vision Plan Implementation Strategies for the 2009 Academic Plan, 2011 Campus Plan and 2011 Capital Project Budget Request
A facilities white paper draft describing the vision for our future campus. updated September 2012